Once the concrete is poured, the floor is covered well completely.But; how thick has the concrete been poured? Where exactly can you drill for your measurements without causing any damages?
An easy way to check these details is using our CMM Universal Measuring Point from the beginning:
- fast and clear read of the screed thickness using the scale
- easy location of the tube-free zones
Just fasten the self-adhesive foot on to the insulation before pouring the screed.
You can advertise your company even after the screeding by labelling the designated logo area with your sticker.
Please feel free to contact us.